page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54 page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
page 82
page 83
page 84
page 85
page 86
page 87
page 88
page 89
page 90
page 91
page 92
page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132
page 133
page 134
page 135
page 136
page 137
page 138
page 139
page 140
page 141
page 142
page 143
page 144
< prev - next > Energy Mechanical Power tech_guidelines_gravity_goods_ropeway (Printable PDF)
GRAVITY GOODS ROPEWAY
thrust pillar - the concrete tower. It may cause
damage to the trolley, the pillar and may harm the
operator as well. The brake shoes, which are the
only elements for decelerating the sliding down
of the loaded trolley from upper station to lower
station, should be well maintained. A set of spare
brake shoes should always be kept at the lower
station.
9.2.4 Others
The surface of the sheave and the track rope
anchorage post, which touches the ropes,
should be examined. If these surfaces are
scored, then it will wear/tear the rope. Either
replace such sheave or scrap off the worn
surfaces
The anchor blocks with hook for each track
rope and the thrust tower at upper and lower
station should be concreted carefully
The U bolts connection for friction locking of
the track rope should be checked
Due attention should be given to the size of the
shaft and the quality of the bearings because
very large number of intermittent cycles need
special care in harsh weather.
The link between the loaded trolley and the
hauling rope should be well adjusted so as to
accommodate change in function from loaded
mode to counter weight mode of operation
9.3 First Aid
A first aid box is to be kept at the site during the construction to provide primary care and treatment in
case of incidences of accidents during its construction and operation at each station.
9.4 Tools
One set of tools and accessories, for both at
the lower and upper stations is required at each
gravity ropeway site for its operation and regular
maintenance.
i. Weighing machine
ii. Screw/slide wrench 12"
iii. Pipe wrench 400mm
iv. Ring spanner set
v. Double ended spanner set
vi. Handle for manual operation
vii. Screw driver
viii. Oil can
ix. Water cans at upper station
x. Small grease gun
xi. Brake shoes at bottom station (spare)
xii. Griphoist (Typhor) machine or chain pulley
xiii. Spare bulldog grips
46